5tons
66,555 BTU/hr — 480 ft² per ton at a 110°F design day
2,400 ft² in Whitney, NV5 tonsNominal size to b…5.55 tonsCalculated need8,572 kWh/yrCooling energy at…5.8 tonsSame house on the…
Nominal size to buy5tons
Calculated need2,400 ft² × 27.7 BTU/ft², interpolated from 4,007 cooling degree days5.55tons
Summer design temperature1% design dry bulb at McCarran International Airport — the level the air is above for 1% of the year's hours110°F
Winter design temperature99% design dry bulb — the number a heating load starts from32°F
Cooling design difference110°F outside against 75°F inside35°F
Summer day–night swingJune–August average — a fairly dry climate, and humidity is what sets the latent load23°F
Days at or above 90°F136days/yr
Cooling degree daysbase 65°F, annual average4,007°F-days
Heating degree daysbase 65°F, annual average1,705°F-days
Cooling energy at SEER 148,572kWh/yr
Cooling cost per yearat 16.7¢/kWh, the national residential average$1,427
Oversize from rounding upwithin the normal rounding step-10%
Equivalent full-load hourshow long the compressor runs at full output over a season1,803hr/yr
Same house on the Gulf coastaround 5,100 cooling degree days5.8tons
Same house in the upper Midwest1.58× spread for the identical building3.7tons

Notes

  • This is a rule of thumb keyed to Whitney's climate, not a Manual J. The tonnage above comes from 27.7 BTU per square foot. That figure is not a lookup: the industry's zone table turns out to be a degree-day table in disguise, so it is interpolated continuously against Whitney's own 4,007 cooling degree days — two cities in the same zone 800 degree-days apart do not get the same answer here. What Whitney actually contributes is the two design temperatures — 110°F in summer and 32°F in winter — and those are the numbers a real load calculation begins from. A house here with new windows and a sealed envelope can come in a full ton under this; a 1960s house with an uninsulated attic can come in a ton over.
  • Whitney is on the dry side — summer nights drop 23°F below the afternoon high, and only dry air lets heat radiate away like that. Latent load is small, so almost all of the capacity above goes into temperature rather than moisture. Two consequences: evaporative cooling is worth pricing here in a way it never is on the Gulf coast, and a slightly undersized unit is more forgiving than it would be in a humid climate, because it will still hold comfort even when it runs continuously on the hottest afternoon.
  • 136 days a year reach 90°F here, and the design temperature is 110°F. Equipment is sized for the 1% condition, not the hottest hour on record — which means on the hottest afternoons of the year this system is expected to run continuously and still drift a degree or two above setpoint. That is the intended behaviour. Sizing for the record high instead would leave the unit oversized for the other 361 days, short-cycling through all of them.
  • Bigger is not safer. An oversized compressor reaches setpoint and stops before it has run long enough to dehumidify, then starts again minutes later. Short cycling is the single most common cause of early compressor failure, and it is bought, not suffered.
  • Running cost, roughly. 4,007 cooling degree days works out to about 1,803 equivalent full-load hours here — the number of hours the compressor would run at full output if it ran flat out instead of cycling. At SEER 14 that is 8,572 kWh a season, about $1,427 at the national average rate. Moving to SEER 18 would cut it to roughly $1,110 a year — worth pricing seriously in a climate that runs this many hours.
  • About the climate figures. Everything above is computed from ERA5 reanalysis at Whitney's own coordinates over 2015–2024, not copied from a table: 1,705 heating and 4,007 cooling degree days, base 65°F. The zone shown alongside is derived from those degree days against the ASHRAE 169 boundaries — your building department assigns zones by county from older climate normals and may list a different one, so go by the county table when you are pulling a permit. City-centre readings also run a degree or two warmer than the airport station most published tables use.

The short answer

A 2400 square foot house in Whitney, NV needs about 5 tons — 66,555 BTU per hour, which is square feet per ton.

Where that number comes from

Whitney, NV sees 110°F on a design summer day and runs 4,007 cooling degree days in an average year. Feed those into the load and the house wants 27.731393835222462 BTU per square foot per hour.

The familiar "400 square feet per ton" rule works out to here instead, and that gap is the whole point of asking the question by city rather than by rule.

What the humidity does

The June-to-August dew point averages °F in Whitney, NV. Dew point, not temperature, is what decides how much of the machine's work goes into pulling water out of the air — and that work only happens while the compressor is running.

What it costs to run

At SEER 14, cooling this house through a Whitney, NV summer takes roughly 8,572 kWh, about $1,427 at the national average electricity price.

Before you buy

The number above is a rule of thumb sized to Whitney, NV's climate. A Manual J load calculation is the real answer, and it is the one that accounts for your windows, your insulation and your air leakage. Ask for it before signing.